Wednesday, April 28, 2010

Pictures

I think i will having a hard time obtaining pictures from my company as there are many things that are P&C here, video for presentation? forget it for now..

The last 3 days, i have been repeating the same thing over and over again, is that called work? I'm not sure about that, i was taking down the cavity number from rejected packages because there are flashes on the Epad and Epin of the packages.

From my observation, flashes on the Epin can be observed when under the light, you can see "shinny" things on the mold where it should not happen.

Where as, mold flashes on the Epad can be seen on the back of the package, the "white pad" had come off, as if, you take a squarish white paper, and you randomly tear it into two, then you paste one of the half on the package. (The actual one is a squarish white pad)
That's what i seen O_O. The technical part how and why it happens, i think i need to do more research on it.

Thursday, April 22, 2010

Control

Usually, every electronics company especially semiconductor will have private and confidential documents called control plans.

What are control plans? They are simply documents for customers and management staffs in the company to have a reference on the specifications of a particular product. Customers will determine whether the company fulfill they condition on the product while staff members in the company will constantly develop and improve on the product. Staff members will update the control plans for the engineers and operators to refer and for the customers to check. That's basically the control plans.

What i work on last 3 days, was looking through a type of product, TSSOP and tried to understand all the information needed in it. And i try to make out a document called "simplified" control plan, where only selected parameters in control plan will be taken out to put into the "simplified" control plan. This document was meant for reference for process specification documents. Sounds confusing?

Control Plan <---> Simplified C. Plan <---> Process Specs

What i was doing the last few days was to build the 'bridge' ^^