Sunday, June 6, 2010

Week 9

Every production area, lab, line has its own 'uniform' to wear before entering. In my training area, i enters the EOL production line almost every day. I was given a pair of slipper, a smock, and a hair shower cap look-a-like on the very first day of training.

I was not really understand its purpose until recently where i read an article about ESD (ElectroStatic Discharge). ESD is when two different potential charge material in close contact, electrons have the tendency to cross over to the other side and vice versa depending on the density of electron. This ESD is hazardous to the semiconductor company as a simple human touch on a package may cause the internal wiring to be distorted. Sounds very unbelievable but it's the truth. Thus, during visual inspection and inside line, we are required to wear attires that are ESD-free to minimize the risk of loses. Compared to FOL area which only leaves eyes uncovered. , EOL is not as strict as FOL.

I enjoyed taking pictures of defect packages during this week as i get to know different kinds of common problems happen to semiconductor devices today. Taking pictures by using Smart Scope enabled me to magnify the defects to get a closer look (although i could not provide solution to the problems)

Lecturers visiting are over and report, logbook submission are near, one more month for me for industrial training ~

Week 8

Just realized that i did not update my week 8 blog.

There is a new term i learnt during week 8 which is 'coplanarity' where when a package is placed flat on a surface table, we can notice there are certain sides of the package which is not touching the table. They are purposely designed that way and not categorized as defects, unless the coplanirity (the height from the surface to the lead legs) exceeded certain numbers. I had the chance to know it when there were customers' complaint on it.

Hopefully i have a chance to ask more details of it in the future. And Friday was Wesak Day off day =D

Wednesday, May 26, 2010

Week 7 in review

Last week, i was doing most of the same thing as last time, doing reject mapping for packages with flashes / mold flashes problems.

But i still able to learn a few new things. Mr.Lee had shown me how to even further use the functions of Profile Projector. I was taught on how to measure the lead foot length and the shank angle to check whether the specification has gone out of range. This is to keep in check to prevent future customers' complaints on bent shoulder, overly bent lead, etc.

Last Friday, i have the opportunity to help out my supervisor and Mr.Lee on one of the emergency call of complaints. Many lots were suspected to have bent shoulder and prevention had to make quickly from the lots shipping out to customers. Finding the appropriate machine with the correct package, i converted much of the data into soft-copy for my supervisors' usage for their meeting.

And also, it's time to begin my final report, everything don't wait until last minute !

Sunday, May 16, 2010

Week 6 in review

My blog post is not as many as before as the basics i learnt in Infineon are much covered and usually i will share the highlights of what i had learnt if they are pretty amusing or interesting.

Week 6, i was helping another engineer, Mr. Lee to help on his project. His project was to find out the root cause of bent leads problems as complained by customers. As stated last week, root cause can be caused by several factors and i was taught how to observe and give hypothesis on the possible factors. The factors will be further tested to see whether they are really the main problem. Over the week, i was helping in taking pictures of bent leads using two different equipment. They are Smartscope and Profile Projector.

Smartscope is a special electronic microscope that are able to scan each and every legs of a package with the help of a software (i wasn't doing this as it is complicated and require many technical skills). It has other simple functions such as taking picture by magnifying the packages. By controlling the appropriate lighting, the best bent lead pictures are taken down to be submitted for Mr. Lee report.

Profile projector is yet another microscope but it was much more manual device. It has almost the same capability as normal simple microscope, but the special part of it is the ability to measure. Measurement can be taken by rotating the wheel button and only flat surface measurement is possible, which means X and Y axis only. I was asked to use this function to measure the length of the package to check whether the angle of the leads are still in the range. If the readings are very high compared to reference value, which means the specification in the angle of leads has gone wrong in the machine and vice versa.

I also learnt in this week about the difference of Trim & Form process I and II. During Trim & Form I, the tie bar between the leads are removed. Tie bar purpose is to prevent the molding compound from overflowing into the leads during molding process. While in Trim & Form II, packages are separated from lead frame, leads are bent accordingly and finally placed on the tray.
Summary:
Trim & Form I: final product in lead frame, tie bar removed
Trim & Form II: final product in individual package, leads are bent

That's all for now, looking forward to lecturer visiting day!

Saturday, May 8, 2010

Week 5 in review

For the last week, there isn't much new things that i learnt as i was repeating almost the same thing everyday, with the quantity is either many or little. i have been updating a record of flashes/mold flashes defects to be reported to my mentor. Checking cavity number, using production line software to trace out the date, machine, package type during molding and wire bond process.

On thursday, i was called by my supervisor to help another engineer which is also under his supervision to help on "bent leads" problem. Bent leads problem is usually caused by either human error, machine problem, handling method and tray. But we are most interested to find out the main cause or root cause to cure the problem. I would not be doing the analysis but more likely to help on sorting out the smaller tasks to assist the engineer.

Firstly, i was given a task to check on the matrix dimension (eg 1 x 6, 2 x 6, etc) for several packages and the dimension of the tray used to place packages after trim/form process. And then to check out the position of first leg of the packages in leadframe form when entering the trim and form machine. All these small tasks may be easy, but we should not ever overlook easy stuffs, as they might be the devil behind the problems ;)

Looking forward to learn more new things next week, and time to begin my final report :o

Wednesday, April 28, 2010

Pictures

I think i will having a hard time obtaining pictures from my company as there are many things that are P&C here, video for presentation? forget it for now..

The last 3 days, i have been repeating the same thing over and over again, is that called work? I'm not sure about that, i was taking down the cavity number from rejected packages because there are flashes on the Epad and Epin of the packages.

From my observation, flashes on the Epin can be observed when under the light, you can see "shinny" things on the mold where it should not happen.

Where as, mold flashes on the Epad can be seen on the back of the package, the "white pad" had come off, as if, you take a squarish white paper, and you randomly tear it into two, then you paste one of the half on the package. (The actual one is a squarish white pad)
That's what i seen O_O. The technical part how and why it happens, i think i need to do more research on it.

Thursday, April 22, 2010

Control

Usually, every electronics company especially semiconductor will have private and confidential documents called control plans.

What are control plans? They are simply documents for customers and management staffs in the company to have a reference on the specifications of a particular product. Customers will determine whether the company fulfill they condition on the product while staff members in the company will constantly develop and improve on the product. Staff members will update the control plans for the engineers and operators to refer and for the customers to check. That's basically the control plans.

What i work on last 3 days, was looking through a type of product, TSSOP and tried to understand all the information needed in it. And i try to make out a document called "simplified" control plan, where only selected parameters in control plan will be taken out to put into the "simplified" control plan. This document was meant for reference for process specification documents. Sounds confusing?

Control Plan <---> Simplified C. Plan <---> Process Specs

What i was doing the last few days was to build the 'bridge' ^^

Monday, April 19, 2010

A Walk in Production Line

Today, i followed my mentor, Mr. Anas to do some inspection around production line, maybe his work is too technical for me, mostly, i was just observing what was he doing around, how was he communicating with the operators and many more.

Electronics/ Semiconductor devices are actually easily spoil in our world. Just as in the production line, there is always 'defects' no matter how accurate, precise the specification of the machine. In Process Control and Instrumental subject, it stated that error can't be detected and rectified if there is no error detected at all. Prevention actions can't be taken if we don't know what and where is the error. Therefore, when defects are detected in production line, operators and engineers are there to solve the problem to minimize the problem to reduce the lost.

Wednesday, April 14, 2010

Historical Day

Yeah, today is Thursday and i do not need to go office as 15th April is declared state holiday for Malacca in recognizing Malacca as historical city ^^

Yesterday i didn't learn much thing again as my supervisor and mentor are busy with their works as production line always have problem floating up from nowhere, the office was very lively(with people talking as usual) but i do not know what to do.. argh.. hope my supervisor gives me something to do soon, i'm bored in the office!!!

Tuesday, April 13, 2010

Possible Mini Project !?

Today was another free day as my supervisors are busy in the morning and in the mid afternoon, i just proceed with my reading pleasure for the books from yesterday.

After that in late-afternoon, my supervisor asked me to go into his 'room' and gave me a short tutorial on 'molding', i thought i know most of the information already but i was surprised by even more hidden knowledge which i didn't go explore myself.

The highlight of the day came when i was told by my supervisor that i might need to help out my mentor which is Mr.Anas to study for the case of Wire Shorted to Wire, and find out the root cause of the problem, this could be very technical and he instructed me to do more reading with the relevant package. Hopefully there is something for me to do tomorrow as i don't wish to just shaking my legs in the office ~

Monday, April 12, 2010

A kinda Free day

Today, there is nothing to do much in the office, i learnt how to use Microsoft Excel which i find quite interesting because several 'functions' i didn't try before using it. One of the functions is Pivot Table where it can summarize very heavy duty data, by categorizing it nicely for the users. Well, it is quite hard to explain in words but if you have a chance, try it out :D

Due to nothing to do in the afternoon, my brother who is working inside Infineon forwarded some Ebooks for me to read, i read one of the books, which tells about the magnificent way of presentation skills by Steve Jobs, the co-founder of Apple. What catches my attention was the way he presents with his presentation slide. Sometimes, the slide consists of just one word or one number and he can tell important points on why his company products are better than the others. It also mentions that presentation slide must not consist of bullet forms which i have been doing all the time in university!!! the reason is human memory doesn't hold as good as Intel Quad Core or Core i7, and human has short term memory when they have to glimpse through so many information at one time if there is bullet form..

Hopefully when i read finish the book, i can share more clearly of what i read :)

Saturday, April 10, 2010

The First Holiday!!!

Hooray, enjoying myself with the first weekend with no works for two days, actually working can be tiring and there is no much time left after everyday when i reach home, approximately 3 hours to do my own stuff after settling industrial training stuff, and need to sleep early due to early wake every weekday.

For the past 2 days, what am i doing in my company is analyzing rejected packages from customers but double-confirm with their complaints and to know which parts of the packages were spoil so that appropriate action can be taken to overcome the defects.

On thursday, I was learning to know how to identify Lot Number and Cavity Number on the packages itself. It took quite some time to scan through all 250 packages with very small and not very obvious coding. My job was to segregate them into appropriate Lot Number (production number of the same machine and for a particular time) and then jot down all the Cavity Number (due to packages are made in abundance inside the machine, it is important to have each individual Cavity Number made by particular section of the machine, simply meaning the Cavity Number applies that the two packages were made on the same side of the machine)

On friday, My job was to use X-ray to inspect Wire Short To Wire (WSTW) packages because the mold had already covered up the thin and fine wire, therefore X-ray is needed to look into each packages. WSTW are usually caused by Molding process because of 'stickiness' property of the mold compound (i have yet to ask and understand about it). Again, it was very time consuming process but overall an on-hand experience is better than none :)

Thursday, April 8, 2010

Office

Ever dream of working in a cool company where you will just sit around in the office and enjoy the air-conditional? Well, that doesn't apply to most of the jobs today. Every single job requires worker to go to the 'site', such as power plant, production line, classroom (for lecturer), under the hot sun and many more.

In my training area, i was required to go to production line everyday where the noise level is high. However, it doesn't seem to be that bad once you are getting use to it. Safety, Health and Environment (SHE) department in Infineon stated that no one should be playing pranks and should be serious during work. But that doesn't apply here, everyone was working happily where they keep chatting and joke once in awhile. It seems to me it helps to cure the boredom at works and release stress too.

I will update my blog on today's and tomorrow's work because they are related, till then

Wednesday, April 7, 2010

Mold ? ? ?

Hi, today let's us look at what is mold.

mold

Am i dealing with this kind of mold in my work? of course NOT, this is a kind of fungus thingy.
What am i dealing with is actually called molding which is the process of encapsulation with plastic compound to protect the delicate chip and wires from being damaged by external factors, such air, human contact, water, etc..

This can be further explain by primary school science, where we use a test tube to fill in with clean water, and then added with a layer of oil. The layer of oil will prevent oxygen from leaving and entering the water. Just like the mold on top of the die, is to protect it from outside substance.

There is not much work today in the plant as my supervisors are busy with their works, but today was the first time i had on-hand experience to handle package. It was to sort out those seemingly good packages which were rejected by the customers. Those packages that were sorted out will be further taken to be tested with X-ray to match with customers' complaints. Hopefully there will be more things to learn tomorrow, till then.

Tuesday, April 6, 2010

A fine day in EOL production area

Today, Mr.Anas, my mentor brought me to the End of Line (EOL) production area to further enrich my knowledge on the process involved in molding package before it can be placed on sales.

There were many automated machine which help in bonding wire and molding which lessen the burden of workers to produce the package manually. Human errors may come easily which will cause alot of revenue to the company because the process in bonding wire and molding require skillful technician in handling it. However, this does not mean machine produce zero-defect products! Technicians were hired to inspect, record, maintain, and to make sure the process are going fine in order and they have to check for abnormalities lie within the package which can and can't be seen by the naked eyes.

Mold compound (the material before it was input to the machine to mold the surface of a die) is made up of many elements in order to give the best performance to minimize the defects and to maximize the profits for the company. This small material which is able to offer protection to the die is basically the component i will be dealing of for most of the time in the company i guess.

Many machines and processes involved are not very well known to me in Uniten, and i'm not sure whether they are "private & confidential" things to mention. Well, i will just see about it.

Till then, hoping more exciting and new things to learn :)

Monday, April 5, 2010

The First Day

The first day of Industrial Training surely can't resist the over-excitement, well it is mainly due to it's the first day!

A 30-minute ride earlier to Infineon Technologies was to make sure the process of checking in at the guard house do not cause any delay in arriving the destined block. While waiting for the staff to arrive, i met with another trainee from UKM who is supposed to undergo his training for 5 months. Unfortunately, he is assigned to different department from me.

A short briefing was given to explain more details about the reports, logbook, site map, allowance, canteen, smoking area and the badge. After that, i was greeted by my host supervisor, Mr.Azmi and we shifted to Manufacturing Engineering Department which i am assigned to for 3 months.

The whole atmosphere at the office was different/weird as the environment clashed with the one i used to have in my university life. There were seniors and people who have vast experience in working field than me. However, i must be humble and have the willingness to learn new things from them. Later, i was further assigned to Molding Unit which is part of the End of Line (EOL) production under the mentor of Mr.Anas.

The first problem i had in Infineon was the badge as i did not receive it on this first day. But it is solved by asking nearby seniors to give me a hand by scanning their badges on the security door in order to access the canteen and toilet.

All in all, first day at Infineon proved to me that i need to adapt fast with the changes going around me and to give my best shot!

Saturday, April 3, 2010

The day before the day and before the day

This coming Monday, i shall begin my industrial training at Infineon Technologies at Melaka for 3 months. I should be considered lucky as the company is just a stone's throw away distance from my house. I can save a few bucks on my transportation fees, accommodation fees and dinner. Sometimes, maybe i should have the initiative to walk to Infineon to exercise ~



Infineon Technologies

Hopefully in these 3 months time, i am willing to work hard to learn many new things and get a taste of working life before i finish my final year of studies in Uniten. In our life, we will never learn anything unless we make a move, as said by Jiashen "No pain, no gain".

Till then, hello Infineon Technologies.

Friday, February 26, 2010

First Entry

The reason i made this blog is to share the experience to be gained during the Industrial Training at Infineon Techonologies which is from 5th April to 5th July 2010. Hopefully the first two days of new semester doesn't have anything important (submit logbook, etc) related to Industrial Training as my future company requires at least a full 3-month internship. Well, that's good as i can learn more things =D

Blogging, it has been a long time since i abandoned my 2 old blogs which are friendster blog and MSN blog. Did not update anything more than a year i think, haha, maybe because i do not have anything in mind to share. My mind is always blank O_O. Any kind of emotions thingy will be soon be forgotten as i am a forgetful person ^^

I would not customize much of this blogspot until i find motivation/inspiration to do so. So for now, just let it be this way ^^