Saturday, April 10, 2010

The First Holiday!!!

Hooray, enjoying myself with the first weekend with no works for two days, actually working can be tiring and there is no much time left after everyday when i reach home, approximately 3 hours to do my own stuff after settling industrial training stuff, and need to sleep early due to early wake every weekday.

For the past 2 days, what am i doing in my company is analyzing rejected packages from customers but double-confirm with their complaints and to know which parts of the packages were spoil so that appropriate action can be taken to overcome the defects.

On thursday, I was learning to know how to identify Lot Number and Cavity Number on the packages itself. It took quite some time to scan through all 250 packages with very small and not very obvious coding. My job was to segregate them into appropriate Lot Number (production number of the same machine and for a particular time) and then jot down all the Cavity Number (due to packages are made in abundance inside the machine, it is important to have each individual Cavity Number made by particular section of the machine, simply meaning the Cavity Number applies that the two packages were made on the same side of the machine)

On friday, My job was to use X-ray to inspect Wire Short To Wire (WSTW) packages because the mold had already covered up the thin and fine wire, therefore X-ray is needed to look into each packages. WSTW are usually caused by Molding process because of 'stickiness' property of the mold compound (i have yet to ask and understand about it). Again, it was very time consuming process but overall an on-hand experience is better than none :)

No comments:

Post a Comment