For the last week, there isn't much new things that i learnt as i was repeating almost the same thing everyday, with the quantity is either many or little. i have been updating a record of flashes/mold flashes defects to be reported to my mentor. Checking cavity number, using production line software to trace out the date, machine, package type during molding and wire bond process.

On thursday, i was called by my supervisor to help another engineer which is also under his supervision to help on "bent leads" problem. Bent leads problem is usually caused by either human error, machine problem, handling method and tray. But we are most interested to find out the main cause or root cause to cure the problem. I would not be doing the analysis but more likely to help on sorting out the smaller tasks to assist the engineer.

Firstly, i was given a task to check on the matrix dimension (eg 1 x 6, 2 x 6, etc) for several packages and the dimension of the tray used to place packages after trim/form process. And then to check out the position of first leg of the packages in leadframe form when entering the trim and form machine. All these small tasks may be easy, but we should not ever overlook easy stuffs, as they might be the devil behind the problems ;)

Looking forward to learn more new things next week, and time to begin my final report :o

No comments:

Post a Comment